Help:To Do

From CSI Wiki

Jump to: navigation, search
H E L P

For Readers

Navigating The Wiki

For Contributors

Introduction
- Files
- Semantic markup
Templates
Content
- Structure
- Naming Conventions
- Subpages
- Markers
- Style
To Do List

(e)

Prioritized goals are listed below:

Comment Who Priority
To Do:SemanticDrilldown Create new templates for first steps tutorials, example problems. ok 0.90.9
To Do:Article Quality Ranking Introduce rating for article quality. Can be part of existing templates. ok 0.910.91
Steel girder bridge/test problem 1 Develop tutorial for analysis and design of steel girder bridge and compare against design example by FHWA. ok 0.950.95
Segmental bridge/tutorial Develop tutorial for segmental bridge analysis and design based "Precast Segmental Viaducts, Hawai" by Gerard Sauvageot ok 11
Navigation Finalize all helps topics in the wiki. ok 22
Concrete wall and steel frame complete example problem A ok 55
Response spectrum generation (verification problem) Upload files for response spectrum generation verification problem. ok 1010
Tendon/test problem 1 Create basic tutorials for tendons, explaining how tendon loads are calculated and applied. ok 1010
Pendulum (test problem) Upload model for test problem with pendulum. ok 2020
Memory usage Describe how program uses memory and how the memory usage can be optimized. ok 2020
Shell reinforcement design Update shell reinforcement design to reflect that it is done according to Eurocodes since V14 ok 8080
Pattern live load factor Provide numerically solved example: 3 span continuous beam with uniform and point loads, check mispan moment ok 8080


(The above list contains to do items with priority higher than 100, to see all to do items, please visit the talk page.)

Personal tools